Planning fire-door works alongside an office refurbishment
A practical guide to coordinating fire-door work with an office refurbishment, from the initial brief to handover.

Need Expert Advice?
If you are unsure where to start with fire door compliance, installation or remedial works, our team is ready to point you in the right direction.
Table of Contents
No anchors found on page.
Fire-door work is easier to plan when it is considered at the start of an office refurbishment. Door locations, access arrangements and surrounding finishes can affect the sequence of work. Agreeing the scope early helps the building team and fire-door specialist understand where their responsibilities meet.
This guide is for office occupiers, landlords and property managers planning work in England.
Start with the building’s fire-safety information
Gather the current fire risk assessment, available drawings and previous door inspection records. Identify who controls the premises and who will coordinate decisions during the works. Government guidance explains the responsible person’s duties, including reviewing the assessment and maintaining appropriate precautions. Building work must also meet the applicable building regulations. Read the government’s workplace fire-safety guidance.
Share proposed layout changes with the people advising on fire safety before committing to a door schedule. A refurbishment quotation alone does not establish which doors or other precautions the building needs.
Give each door a clear scope
Use a door schedule or marked-up plan to identify the doors being assessed. Record their location, the proposed work and any information that is missing. Distinguish an inspection from repairs, replacement and work to the surrounding construction.
Ask the specialist to explain what their survey covers, what evidence supports a proposed repair or replacement, and which adjoining works are outside their quotation. Avoid making assumptions from a door’s appearance alone.
Coordinate the surrounding trades
Refurbishment may involve flooring, partitions, decoration, access control or changes to services. Ask the project team to review how those activities relate to the door work and agree the order before the programme is finalised.
For each interface, record who is responsible, what information they need and when the completed work will be checked. A brief shared schedule is more useful than separate instructions that leave gaps between trades.
Plan access while the building is occupied
Discuss operating hours, deliveries, noisy work and the areas that will remain in use. Agree site-specific arrangements with the responsible person and the project team before work starts. Temporary arrangements need to be considered as part of the work plan; do not assume everyday access arrangements will remain suitable throughout.
Agree the handover before work begins
Ask what records will be provided for the agreed scope. These may include the door schedule, inspection findings, photographs, product information, records of completed work and maintenance instructions. Confirm what any certificate or report covers, who issues it, and what it does not assess.
Keep unresolved items visible at handover and record who will address them. Store the information where the people managing the building can find it for future inspections and alterations.
When the project includes wider refurbishment
Leading Edge provides fire-door inspections, repairs and installation services. Our partner Aspire Building offers support with the wider building scope through its office fit-out and commercial refurbishment services across London, Essex and Suffolk. Contact the relevant business to confirm the scope and availability for your property.
Where a project involves both businesses, confirm the scope, quotations, responsibilities and coordination arrangements at the outset.
What to send with your enquiry
The property address and how the building is used.
A short description of the refurbishment and proposed layout changes.
Available plans, door schedules and inspection records.
Access restrictions, occupancy and preferred timing.
The contact responsible for coordinating the work.
Discuss your fire-door requirements with Leading Edge.
General planning guidance. The appropriate fire-door specification and fire precautions depend on the building and its assessment.